奇米四色二区_人妻无码熟妇乱又视频_豪妇荡乳在线观看_成a人片亚洲日本久久_精品久久久国产精品999_xxx性护士hd另类

How to realize good explosion-proof performance of liquid ammonia emergency shut-off valve?

Time:2021-09-17
Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.

How to adjust the pressure relief valve group of the concrete pump truck correctly? In the construction process, if the operators move disorderly due to their unclear understanding of the performance of each part of the concrete pump truck, it will easily lead to various faults in the operation of the concrete pump truck, which will bring a lot of inconvenience to the on-site construction. Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.


1、Overflow valve regulation

When adjusting the pressure relief valve group, first adjust the condition of the overflow valve through the following steps: first loosen the adjusting rod of the superimposed overflow valve under the electromagnetic directional valve on the main valve block, and then tighten all the adjusting rods of the unloading overflow valve on the pressure relief valve group. Remove the electromagnet plug on the main overflow valve, press the positive pump button, then slowly adjust the superimposed overflow valve, observe the reversing pressure gauge, and lock the adjusting rod if the pressure is.


2、Accumulator unloading ball valve regulation

After adjusting the overflow valve, the adjustment of the accumulator unloading ball valve is also very important. The operation steps are as follows: open the accumulator unloading ball valve, loosen all the adjusting rods of the unloading overflow valve, then close the accumulator unloading ball valve, slowly tighten the adjusting rod of the unloading overflow valve, and then observe the condition of the reversing pressure gauge. When the pressure indication is 16MPa, the adjustment can be stopped, Lock the adjustment lever.


3、Regulation rules

In the whole regulation process, because the gear pump is connected with the accumulator, the pressure changes slowly during regulation, and attention should be paid not to be too fast during regulation. After adjustment, plug in the electromagnet plug on the main overflow valve to stop pumping.

主站蜘蛛池模板: 5g影院天天5g天天看 | 玩弄放荡人妻少妇系列 | 一二三四五社区在线高清观看 | 日本videoshd| 国产在线无码永久免费 | 天天躁日日躁成人字幕aⅴ 久久久黑人 | 国四虎影永久 | 丰满少妇奶水一区二区三区 | 卫生间被教官做好爽HH视频 | 欧美性猛交xxxx免费视频软件 | xxx欧美videos | www艹逼 | 日本成人福利视频 | 日韩人妻无码精品久久久不卡 | 日韩福利影院 | 欧美性猛交xxxx乱大交退制版 | 亚洲偷精品国产五月丁香麻豆 | 亚洲成人久久影院 | 久久久毛片 | 国产精品18久久久久久久久 | 国产熟女一区二区三区五月婷 | 日本网站免费观看 | 91新网址| 黑鬼吊太大少妇尖叫 | 亚洲第一区中文99精品 | 免费国产黄网站在线观看视频 | 小男同xvideos gay | 久久久久黑人 | 农村黄色一级片 | 国产农村一级特黄α**毛片 | 国产视频不卡一区 | 男人天堂成人 | 日本女人性淫视频 | 欧美久久久久久久久久久久久久久 | 午夜婷婷精品午夜无码a片影院 | 大地资源网在线观看 | 护士奶头又白又大又好模 | 国产精品免费麻豆入口 | 国产麻豆精品久久 | 日韩一级少妇 | 亚洲国产精品探花av |